Example of a panel anchor installation

Status of an equipment fixing execution
The earthquake countermeasures for equipment to prevent slide or upset of devices or equipment on the raised floor. The installation is performed by the following methods according to the installation environment and the operating conformation of the devices and equipment.
When considering the execution of your construction, please consult maintenance companies or the manufacturers of the devices and equipment.
Backgrounds of the Vibration Test |
|---|
Installation method |
Installation of the panel anchor |
Installation of the pedestal hook |
Installation of the frame anchor |
Fixing of the pedestals |
||||
|---|---|---|---|---|---|---|---|---|
Example of installation |
|
|
|
|
||||
Counter- |
Fix equipment / devices to the panel, then fix the hardware to the slab via an anchor through a turnbuckle. |
Fix equipment / devices to the panel, then fix the panel to a pedestals by a turnbuckle. |
Penetrating the panel from the equipment / devices, fix them to an anchor through a turnbuckle of the slab immediately below the panel. |
Fix to a pedestals fastened to the slab by fixed type panel material. |
||||
The temporary transfer of devices and equipment |
Unnecessary (To prevent problems, the power supplies of the equipment / devices need to be turned off during the work.) |
Necessary |
Necessary |
Unnecessary |
||||
Anchor bolt fixing to slab |
Necessary |
Unnecessary |
Necessary |
Unnecessary |
||||
Exposure of the fastening hardware to devices and equipment |
With exposures |
With exposures |
Without exposures |
With exposures |
||||
Interference with the under floor wiring |
With a little |
Few |
Few |
Few |
||||
Study of the bodies of devices and equipment is necessary to select an installing method.
All methods require sufficient raised floor panel strength. In addition, the applicable Floor height is H = 300 mm or more.